25 August 2010
Reorder level is the level in which the materials are need to be order
Minimum level is the minimum stock always there in hand, this point is the mid point between the Danger level and reorder level
EOQ and ROL both are different meaning, EOQ level in which level the purchase cost will be optimum that lelvel, but EOQ may or may not be a reorder level