07 November 2014
my client is a vehicle manufacture. He sent material for processing on jobwork basis. I got the assignment of internal audit of job work processing. pl provide checklist for the same.
07 November 2014
01. Material outward/Sent report 02. Material received/entry report 03. Material Inspection Report. All the reports are generated at your client's premises only. Your control is to tally these 3 reports in all respect.....rate, quantity, weight, technical specifications.
07 November 2014
Is it covered in your INTERNAL AUDIT assignment? If yes, then better do a RISK analysis. And for statutory compliances, you need to look into the service tax aspect as well.