Easy Office
LCI Learning

Ware housing project..


20 March 2013 PLEASE URGENT HELP..

MY CLIENT NEED A PROJECT REPORT AND A NET WORTH CERTIFICATE FOR GIVING TO BANK AND APPROPRIATE AUTHORITY FOR SUBSIDY

PLEASE MENTION ME THE FORMAT AND WHAT POINT I NEED TO INCLUDE IN THAT CA PROJECT REPORT AND ..WHETHER IT REQUIRES CA'S CERTIFICATION...

PLEASE IF HAVE SOFT COPY PLEASE MAIL ME ON
party01@rocketmail.com

20 March 2013 Dear Vineet

please see your email, i have send you one net worth template.

hoping it will serve your concern.


18 July 2013 Capital Investment Subsidy for Construction/Expansion/ Modernisation of Cold Storages and Storages
ITEMS DESCRIPTION
Chapter­I  Making Application for a Letter of Intent
Chapter­II  Guidelines for  Inspection  /  Joint Inspection  Projects  on  Completion
Chapter­III Guidelines for Making Subsidy Claims
Format­I CHECKLIST OF DOCUMENTS  TO  BE ATTACHED  WITH  APPLICATION
Format­II APPLICATION FORM
Format­III AFFIDAVIT
Format­IV BASIC DATASHEET
Format­V Pre­Inspection FormatCHAPTER­I  Making Application  for  a  Letter of  Intent  under  the scheme
"Capital Investment  Subsidy Scheme for  Construction/ Expansion/ Mondernisation of Cold Storages/Storages" 
1. Who can apply for getting Letter of Intent ­
A natural person, a group of individuals or a legal person (Partnership Firm, a Trust,  Cooperative  Society,  a Society  registered  under  Registration  of Society  Act,  a  company, self­help group) may apply for issue of LOI. Where to Apply for Issue of LOI­ 
A.  Physical Application on Prescribed Format  Managing Director  National Horticulture Board
Plot No.85, Institutional Area,  Sector­18, Gurgaon
B. Online Submission of Application  NHB has introduced a system for online filing of applications for Letter of Intent
(LOI) on its website www.nhb.gov.in.  The Homepage of the Website provides a 
link "Apply Online and Track Status " under Cold Storage Scheme. This section  contains information  like  how to  apply,  cost  of  application & payment options,  checklist, etc. to help applicants to apply online. Applicant has following three options to pay the cost of application:­  ÿ Demand Draft  ÿ Electronic Transfer of funds in NHB's account  ÿ Credit/Debit Card (VISA/Master) 
Following is the structure for cost of application:­
Cost of Application  Demand Draft  and
Electronic Transfer  category 
Credit  or Debit Card
(VISA/MASTER)
For Projects  having cost  upto Rs 10.00 lakh Rs 1,000/­  1000/­  (plus applicable  charges towards payment of  gateway  transaction 
fee)For Projects having cost > 20
lakh and upto Rs 50 lakh Rs 2,000/­  Rs 2000/­  (plus applicable charges
towards  payment of  gateway transaction fee) For Projects having cost > 20
lakh and upto Rs 50 lakh Rs 5,000/­  Rs 5000/­  (plus applicable charges
towards  payment of  gateway transaction fee) For Projects having cost > 50
lakh Rs 10,000/­  Rs 10,000/­  (plus applicable charges
towards  payment of  gateway transaction fee)
In  case, the payment option  is  Demand Draft  or through  Electronic  Transfer in NHB's account, applicant will have to first get the demand
draft prepared or transfer the funds in NHB's account, as DD/Electronic  Transfer number is  required  to be given in  the online  application.  In 
this case, an applicant will be issued Temporary ID.  Permanent LOI Code in case of electronic payment would be issued on receipt of funds in NHB's account and 
in the case demand draft on receipt of demand draft by the NHB. 
In case applicant opts to pay cost of application through Credit or Debit Card, he 
is issued on the spot acknowledgement alongwith permanent LOI Code.
After  filing online application,  applicant  should take print out  of his online  application form.  He may take a print out in duplicate, retain one copy for his
records  and  the  second  copy  may  be  attached  with  the  physical application  alongwith other necessary documents. It is necessary for the applicants to fill up
and  submit  the  detailed  application  form (Format­1)  apart  from  online  application form. 
2. How to establish Identity of Applicant­
i.  In cases of applicant being a natural person, his name, sex, age, occupation, 
father’s / husband’s name, permanent address, full postal address supported  by  self­attested passport  size photograph of applicant affixed on application  may  normally  suffice for  establishing identity of  natural person  or  group of 
individuals. 
ii.  In cases the applicant is a statutory person, to know the applicant following
details must be insisted upon­ 
a. Attested copy  of  Document of Registration  of  the  applicant body/company.b.  Memorandum and Articles of Association of applicant body/company.  c.  Board of Director’s Resolution,  duly  passed and  authorizing signatory  of  application to apply for bank loan, NHB subsidy and take all other related  necessary  steps  in  this  regard.  Signatory  of  the  application  must  be described in  the Board resolution  with name,  age, sex,  designation  /  occupation,  father’s  or  husband’s  name,  permanent address,  postal address and  his  self  attested photograph  should be attached  with  the
application form  d.  Applicant body’s Board of Director’s / Competent Body of Management’s Resolution permitting or  approving Investment proposal, taking of  bank 
loan etc should also be enclosed.  e.  A copy of applicant body’s latest Audit­Report and Annual­Report 
3. Title of the land and copy of record of right­
The title of the piece of land on which the project is proposed to be set up should be
in the name of applicant in the capacity of owner or lessee for minimum period of 15
years. In case of land leased, lease deed it should be registered with the Authority 
like office of Sub­Registrar, etc.  A latest copy of record of right showing this fact  should be enclosed with the application. Mortgaged land shall not be treated at par  with lease even if the credit institution might have considered so. Similarly, Power of  Attorney  given  by  owner  of  land  in  favour  of  applicant shall not  qualify  him  for  benefit under the scheme.
4. Validity Period of LOI ­
Validity (i)  For a period of one year from the date of issue of LOI for sanction of term 
loan. 
(ii)  The project  should be  completed  within  two  years from  the  date  of  sanction of term loan.  Project time over run should be suitably examined. 
(iii)  Revalidation of LOI by the concerned Area Officer for a further period of  one year on merit.CHAPTER­II
Protocol for Implementation of Technical Standards
Subject to provisions of Variation Clause, only those cold storage projects that are in conformity with the  prescribed technical standards will be  eligible for Central Government Subsidy. In order to verify this,
following mechanism needs to be put in place­ 
A. System of Letter of Intent (LoI)­ LoI to  be  obtained  by the  promoter  prior to undertaking  construction of cold storage needs to be introduced. An application for Letter of Intent must be  accompanied by following documents, in addition to any other documents prescribed­ 
i. A copy of the detailed project report 
ii. Information in prescribed Basic Data Sheet accompanied by requisite documents
Technical scrutiny of the above documents will be undertaken to ensure that the project is in conformity  with the prescribed technical standards or any variation is fully justified keeping in view the product to be  stored, prescribed storage conditions, energy efficiency and environmental and safety concerns.
B. Civil Structure­ Following  documents must be submitted  by the  promoter in respect of civil  construction 
i. Certificate of approval of the building plan by local planning authority,
ii. Certificate  issued  by registered  civil design engineer about  conformity with relevant BIS  Standards and prescribed standards and safety concerns,
iii. Certificate by site engineer /  architect to the effect of construction of the civil structure as per  approved  building plan and design  and  completion of the  civil components accordingly in  all 
respects as per prescribed plan and standards,
C. Thermal Insulation & Refrigeration System, Control and Safety Devises
i. The components of insulation and refrigeration system should be certified in form of a technical  data  sheet by the  manufacturer  confirming  the rating  and  performance as per  prescribed  standards.
ii. Further, site inspection at appropriate stages of construction / erection and commissioning may  be undertaken by an inspection team constituted by competent authority for this purpose.
iii. Finally, the manufacturer/refrigeration contracting agency will issue a certificate of satisfactory  commissioning  of the  cooling  system in  conformance to the  performance indicators as per  prescribed standards.
iv. The  manufacturer/refrigeration  contracting agency will also provide  “as built drawings”, 
including cold store layout, P&I and electrical drawing and an operation & maintenance manual  along with a list of essential spare parts. v. A set of above documents along­with the refrigeration system performance certificate issued by 
the refrigeration company / contracting agency, duly signed by an authorized graduate engineerof the company/agency, must be submitted to competent authority for record and a copy of the  same must be issued to the promoter / owner of the project.
Guidelines  for  Inspection  / Joint  Inspection  Projects  on  Completion 
Objective­ Inspection /  Joint Inspection  of the  project is carried out  with the  prime objective of ensuring that the project has been completed as per original project report  at  approved project  site  and  all essential components  have been  completed with  satisfactory  quality of  execution  and  acceptable standard  of  workmanship.  It is also  aimed at  verifying  the  vouchers and  other  records  maintained  by  the  beneficiary  in  order to  make assessment about the  component­wise actual expenditure  incurred  by 
the beneficiary and making assessment about cost of the project. It not only gives pen­  picture of  the  project  but also provides photographs  /  video  films as per  standing 
instructions of NHB by way of proof of existence of assets created.
Intimation  of  completion  of  project  and carrying out Inspection  /  Joint  Inspection­ On completion of credit linked project for which LOI has been issued by 
the Board, promoter will inform the concerned financing institution (FI) / Bank about
the completion  of  the  project.  As soon  as possible  after  receipt  of  the 
information/documents regarding completion of the project FI / Bank will fix the date 
for  Joint Inspection  of  the  project  in  consultation  with concerned  State  Incharge  of  NHB. Such cases will be jointly inspected by representative of NHB and representative  of financing institution (FI) / Bank in presence of beneficiary. Representative of State  Directorate of Horticulture may also be associated as per standing orders of NHB.
Salient features of Inspection Report ­ Bank Inspection Report /  Joint Inspection  Report  will be  submitted in the prescribed form  by the  concerned  FI / Bank to NHB.
Inspection report is in writing giving necessary description of various components of the  project and project land, source of funding, whether all the components of the project  are new etc; it is supported by photograph or video film as per standing instructions of  NHB.Making Assessment of cost of components of project and project as a whole on completion of project­
Inspecting Officer / Joint Inspection Team is also responsible for making assessment of 
the cost of various components of the project and the project as a whole. It is generally  made  by  verifying  documentary  proof  such  as vouchers /  money receipts relating to  procurements  /  services  received  etc.  At  times,  when  veracity  of  vouchers /  money 
receipt is not certain, a fair assessment of cost may be made taking into account the 
local rates etc.  Valuation  made  by  Chartered accountant may  also  be taken  into  account. Generally, the  FIs / Banks release subsequent  and final installments of loan  after ascertaining value of work executed through CA  certificate etc. Such documents may also form the basis of assessing cost of components of the project and project as a  whole.
· Note­ It is advisable to inform the beneficiary about the compliances to be made by him for
forwarding subsidy claim for his project; such as, requirement of fresh affidavit in prescribed
Performa etc.CHAPTER­III 
Guidelines for Making Subsidy Claims 
Procedure for submission of documents/papers for final subsidy claim to the Board:­ The concerned FI / Bank who has provided credit for the project has to submit subsidy claims to respective office of NHB directly according to the delegation of powers 
for  sanctioning subsidy  for  the  project.  In all cases,  the  subsidy  claims must  be
submitted in the following manner by speed post / registered post / or by messenger of 
the Bank who must have Identity Proof of being messenger or must carry authorization  certificate from  the  concerned  bank  branch.  This will help eliminate  possibility 
recurrence of  cases of  submission  of  fake  subsidy  claims as had  happened  in  some States.  NHB  is  proposing to  make provisions  enabling Financing Institution  to  make online  entry  about loan  sanction, release  of installments of  loan, progress of  project 
implementation and making subsidy claims which may facilitate reporting of progress of  project  and  later  on,  processing by  competent authority  in  NHB  of  subsidy  claims pending receipt of signed and attested copies of documents.
Eligible  Project  Cost  (EPC)­ It  is observed that  the  beneficiaries  and  bankers are
sometimes under impression that the subsidy @ 40% of the project cost as appraised
or  as assessed  during Inspection  / Joint Inspection  of  completed project  will be
sanctioned.  This is not true. Therefore, it is being clarified that 40%  subsidy will be  sanctioned and released against the eligible project cost (EPC). EPC is calculated taking
in to account per unit area project cost, and component­wise cost norm.  In addition, it
is to be noted that the component wise eligible cost shall be least of cost indicated in  project report, cost appraised by the bank / FI and cost assessed during Inspection /  Joint Inspection  of  the  project.  The components not  indicated in  project  report,  appraisal report  shall,  therefore,  be  not  eligible for  inclusion  for  the  purpose of  calculation of EPC. Similarly, change in component or project site without prior approval of NHB shall make the component or project, as the case may be, ineligible for getting
subsidy. Even the change in FI / Banker should be done with prior approval of NHB. It should also be ensured that condition of prescribed minimum percentage of term loan is
fulfilled otherwise, subsidy claims will be rejected.
Documents to be submitted with subsidy claims­ Keeping in view of the above,
the subsidy  claims  must  be  submitted  in  the  form  prescribed along  with  following
documents including the Bank Inspection Report :­ 
(a)  Completion certificate of the project as issued by the Bank. 
(b)  Financial appraisal carried  out  by  the  Bank  before sanction  of  term  loan  showing means of finance along with any other details showing investment components and their costs. In case, pre­sanction inspection of project siteis carried out  by  the  FI  / Bank, then  a  certified copy  of each  of such  documents should also be submitted along with subsidy claim. 
(c) Term loan sanction letter issued by the Bank to the beneficiary with detailed
terms & conditions clearly mentioning the purpose of term loan, period of 
repayment along with the activities for which loan sanctioned. 
(d)  Date wise term­loan disbursement detail for the project. 
(e)  Extract of term­loan account of promoter related to the project. 
(f)Copy of Record of Rights of project land as appended in loan document by the  beneficiary along with Search Report, if any, got done by the FI / Bank. This will enable NHB tally the same with the copy of record of right submitted by 
the beneficiary to NHB along with application for LoI. 
(g)  Photographs taken at the time of inspection of the project duly signed by  the Bank  Officer and the promoter.  It should be  ensured  that  the 
Inspecting Officer (Bank  Officer) along  with Promoter  and NHB  officer (in  case of JIT) should also be seen in the photographs. 
(h)  All major components of the project must be covered in the photographs.
(i)  Duly  certified  expenditure  statement (prepared on  the  basis of  vouchers/bills) by Bank or CA certificate as per NHB format  by way of proof  of assessed cost of the project during Joint Inspection 
(j)If release of subsidy by RTGS is preferred by the Bank then application for the  same with details of corresponding subsidy reserve fund account.
Procedure for adjustment of borrower's account:­ 
The subsidy released by NHB to Bank/FI in favour of the project  shall be kept in the  separate account termed as Subsidy  Reserve  Fund.  The adjustment  of  subsidy  to 
term  loan  account  shall be made only  as  back­ended subsidy.  Accordingly,  the  full project cost including the subsidy amount but excluding the margin money contribution 
from the beneficiary would be disbursed as loan by the banks. The repayment schedule will be drawn on the loan amount in such a way that the subsidy amount is adjusted  after the bank loan portion (excluding subsidy) is liquidated. The subsidy amount in the  borrower’s Term Loan account should be adjusted only as a part of the recovery of last
installment which should not be prior to 36 months period from the date of release of  Term  Loan. Therefore, term loan account of borrower  should not be charged interest
from the date subsidy amount is received by the Bank.
Submission of the Utilization Certificate by the Bank/FI:­ 
After  completion of the  project  and  closure of  borrower’s term loan account  and  on  adjustment subsidy amount as part of the last installment which should not be prior to  36 months period from the date of release of Term Loan, the Bank/FI shall submit to  NHB  Utilization  Certificate  of  the  subsidy  amount in  Performa  prescribed (Format­ VIII) .Format­I 
List  of the documents  required for Letter of Intent (LoI)  under the NHB scheme "Capital  Investment Subsidy  for Construction/Expansion/modernization of Cold Storage & Storages  of Horticulture Produce".
Section A
Documents related to Letter of Intent · Application Form (Format­II) · Affidavit (Format­III) · Prescribed cost of application from and scheme brochure · Basic Data Sheet* (Format­IV) · Board Resolution of the applicant firm/Company, if applicable
Section B Detailed Project Report consisting of following details :
. Promoter Profile
. Proof of identity of applicant
. Marketing Strategy
. Implementation Schedule
. Key Map of Project land showing project details and land boundary details
. Site layout Plan
. Financial Analysis
. Annexure
Section C
Land Documents · Copy of latest Record of Right issued by competent authority showing applicants right on land
· Copy of permission to use land for cold storage purposes · NOC from State Pollution Control Board
Section D
Bank Documents
. Bank Consent Letter
Section E
Company Related Documents · Memorandum of Association & Article of Association
· Certificate of Incorporation
· Latest audited annual accounts
* Basic Technical Data Sheet Available in NHB website www.nhb.gov.in under all Technical Standards 
for Cold Storage Type­01, 02 & 03FORMAT­II  1)  Date of application
2)  Control No. : (to be given by NHB)
PHOTO
To The Managing Director  National Horticulture Board  Plot No. 85, Sector­18, Institutional  Area, Gurgaon­122015
(Haryana) 
Application for Letter of Intent (LOI) under the scheme “Capital Investment Subsidy Scheme for Construction/Modernization of Cold Storages and Storages” of National  Horticulture Board)  A. BENEFICIARY/ENTREPRENEUR
1.  Name  :_________________________________  Permanent Address :_________________________________  Postal Address :_________________________________ 
2.  Constitution : Individual/Company/Joint Promoter/Government 
In case of Individual 3.  Category  : SC/ST/OBC/Ex­Service Man  4.  Gender  : Male/Female  ___________ Age _______  5.  Occupation :  5.  Promoters/beneficiary profile : 
In case of companies ­ · Registration number & date of registration
· Registering authority
· Act under which Registered
· Authorized share capital _________· Paid­up share capital _________ Reserves & surplus _______
(by end of last financial year)B. PROPOSED ACTIVITY 
1.  Name of the Project 2.  Location:  Survey/Khasra No.___________ Village ___________, Taluka _______,  District _________, State ___________ 
3. Component : Cold Storage/CA Storage/Modified Storage/Onion Storage/ Modernization of Existing Storage
4. (A) Existing capacity, if any Chamber (s) Capacity in MT  Chamber No. 1 ....................... Chamber No. 2 ....................... Chamber No. 3 ....................... Chamber No. 4 ....................... Total .......................
(B) Proposed new capacity Chamber (s) Capacity in MT  Chamber No. 1 ....................... Chamber No. 2 ....................... Chamber No. 3 ....................... Chamber No. 4 ....................... Total .......................
(C) Chamber/Capacity Proposed Chamber (s) Capacity in MT for modernization  Chamber No. 1 ....................... Chamber No. 2 ....................... Chamber No. 3 ....................... Chamber No. 4 ....................... Total .......................
(D) Justification for Additional Capacity/Modernization 
B.II (a) Whether proposed activity in application is Yes/No  a completely a new activity
(if No, the details of pre­existing activity or any component thereof included in the application
should be indicated clearly) 
............................................................................................................................... 
............................................................................................................................... 
(b) Whether any subsidy has been availed Yes/No 
for the proposed proposal/activity from
Central Govt. or any of its Agencies.
(if YES, please indicate clearly in detail 
................................................................................................................................................................................................................................................................
C. PROPOSED PROJECT COST (Component­wise) 
D.  PROPOSED MEANS OF FINANCE 
(i) Promoter’s share  .......................... 
(ii) Bank/FI term loan  .......................... 
(iii) Proposed subsidy from other sources, if any  ..........................  a) Form State Govt.  ..........................  b) From Central Govt. other than NHB  .......................... Total  ...........................
(Note:  Unsecured loans from friends/relatives will not be treated as equity)  Expected back­ended subsidy from NHB: Rs. …………………
(NHB subsidy will be considered as per Board’s guidelines, if found in order, but not guaranteed) 
E. EXISTING STATUS OF PROJECT 
(Please give details about the activities of the proposed project already completed at the time of
submission of application of Letter of Intent (LOI) 
...................................................................................................................................... 
...................................................................................................................................... 
......................................................................................................................................
G. Whether any assistance in the form of soft loan and subsidy has been availed by
the beneficiary earlier from the National Horticulture Board? If yes, give details
thereof.
..................................................................................................................................... 
..................................................................................................................................... H. Whether  any subsidy has been availed  from  the Board,  other  Central  Govt. organization or State Govt. for  the same activity on same piece of land, khasra no. etc.? 
..................................................................................................................................... 
.....................................................................................................................................
Details of subsidy, if availed from:
(i) MFPI  : 
(ii) APEDA : 
(iii)NHM :(iv)Technology Mission :
I. Name of the Bank/FI from where  the term loan is availed/to be availed by the Beneficiary (Please enclose a copy of the duly filled up term loan Application). 
a)  Name of Bank: ......................................................................................  b) Details of Bank Branch: ……………………………………………….…………………
c)  Bank Code:………………………………………………………………….………………..
J. Date & Amount of sanction of term 
loan, if any : ______________________
K. Details of release of term loan, if any : ______________________
L. DETAILS OF LAND 
I)  Whether own land (ancestral) :  _________________________ 
ii) Whether own land purchased :  _________________________ 
iii) Whether leased If so, how many years lease :  _________________________ 
iv) Whether lease/tenancy/contract is registered with the Competent  Registration Authority
(copy of the proof of each title be enclosed) M. IMPLEMENTATION SCHEDULE OF PROPOSED ACTIVITY 
N. MARKETING OF PRODUCE 
O. Cost of Application Form & Scheme Brochure will be as under: 
Projects costing upto Rs. 10.00 lakh : Rs. 1000/­  Projects costing above Rs. 10.00 lakh
and below Rs. 20.00 lakh : Rs. 2000/­  Projects costing above Rs. 20.00 lakh
and below  Rs. 50.00 lakh : Rs. 5000/­  Projects costing above 50.00 lakh : Rs. 10000/­ 
The above prescribed cost of application form and brochure will be non­ refundable.
P. Please remit the cost of application and scheme brochure by Demand Draft drawn in favour of National Horticulture Board payable at Gurgaon (Haryana)Q. Name & address of consultant who prepared the project report (DPR). 
Certified that the information/contents as above furnished by me/us in the application are true 
to the best of my/our knowledge & belief and nothing material has been concealed. In  case,  any information furnished in the application is found false, my/our application may be rejected
out rightly at any stage by the Board.
(Signature of the Beneficiary)  Name & Address:  ......................... 
Place: Telephone/Fax No. .........................  Date :FORMAT­III
AFFIDAVIT 
(on stamp paper of Rs. 20)
I/we ……………………………………. (Name of the promoter/Director)  Age___ son of Mr. ………………………………(father’s name) resident of ………………… ……….…………(residence address) do hereby solemnly  affirm and declare as under: 
1.  That  I/we am/are individual  grower/promoter/director/partner/group of  growers/association of growers/proprietor of M/s………………………………..(name of  beneficiary) having its  Registration no. ……….  Registered office at  …………………………….. (office address of beneficiary). 
2.  That  I hereby  make application and I am duly  authorised in  my  own  right/by  management vide its resolution no. ……………….dated ………….. to apply and sign all
required documents  including this  affidavit on behalf of company/partnership 
firm/cooperative society  named as  ……………….  ;  and am fully  aware of  the facts 
relating to the setting up the project at Survey  No.  ………………….. Village …………………. Tehsil……………….District………….. State…………………(location of 
the project) for …………………(activities to be undertaken by project) and application is  being made to NHB for seeking Letter of Intent  (LOI) under the scheme “Capital 
Investment Subsidy Scheme for Construction and Modernization of Cold Storage and Storages”. 
3.  That the term and conditions of the scheme of NHB under which an application is made
by the applicant  have been properly read and understood by me and I affirm that the
project/proposal/scheme comply  with the terms  and conditions  of NHB and the
application is made in the correct applicable scheme. 
4.  That the proposed activities  to be undertaken by  the project/proposal  scheme are
covered under the above scheme of NHB and no part of the scheme/infrastructure of the
project is  designed or assigned to be used for any activity other than the horticulture
activities specified in the applicant at present or in the near future. 
5.  That  the information provided in  the application of Letter of Intent  (LOI) is  true and
correct  to the best  of  my  knowledge and belief.  The estimate of the cost  of  project/proposal/scheme;  financial  viability  and operating results  have been worked
out/computed as per the rule and generally accepted principle and norms in this regard.6.  That no subsidy /grants­in­aid other than shown in application form has been availed by 
the promoters/directors/proprietors  for this  new project and component  thereof from
Central Govt. or any of its agencies Except the NHB.
7.  That myself or any  other promoter of Cooperative Society\,  partnership  firm self help
group has  not  availed any  subsidy  from NHB which has  not  been disclosed in  the
application. 
8.  That  I/we also  solemnly affirm that  the proposal activity in the application for LOI is a
completely new activity and not a pre­existing activity or any component thereof.
9.  That I have thoroughly examined notification F. No. 45­64/2010­Hort dated 25.02.2010
for prescribed technical standards w.e.f. 01.04.2010. 
10. That I accept and undertake that the Technical Scrutiny of the documents by NHB or its  empanelled agencies  shall not  in any  way obviate the responsibility  of the Promoter/deponent, to scrutinize his project and insure that it invariability complies to the
prescribed technical standards w.e.f. 01.04.2010 vide notification F. No. 45­64/2010­Hort  dated 25.02.2010”. 
11. That in case of concealment of any facts in this regard, the Board would have right to
reject my application out rightly at any stage.
DEPONENT 
VERIFICATION
Verified on solemn affirmation at ………………….. (Place) on this  ………….. (date) of, ………………….. (month), 2010 that the content of the above affidavit are true to the best of my  knowledge and belief and nothing material has been concealed.
DEPONENT(Self Certification Format to be obtained on a stamp paper of Rs.100)
DECLARATION
I ……………………………………. (Name  of the Consultant) Age ….. son  of Mr. ………………………………(father’s name) resident of …………………  ……….…………(residence address) certify that:
1.  That  I am a graduate engineer and have adequate experience /  expertise in  designing, Constructing and commissioning cold stores, insulation & cooling system
and cold chain infrastructure equipment.
2.  That a copy of my graduation / post graduation certificate of B.E. / B. Tech / M. Tech
is enclosed and shall form part of my certification and declaration. 
3.  That  I am the project /  Technical  Consultant  and have been hired by  the project  promoter________________________ to design,  conceptualize and prepare the
project DPR bearing Ref. No.____________________. 
4.  That I am fully conversant with relevant codes and standards applicable to the cold
chain infrastructure and affirm invariable compliance of  the project  to the above mentioned prescribed Technical Standards. 
5.  That I have thoroughly  examined notification F.  No.  45­64/2010­Hort  dated
25.02.2010 for prescribed technical standards w.e.f. 01.04.2010. 
6.  That  I certify  that  the components  of insulation and refrigeration systems  in  the
prescribed format of the technical data sheet conform the ratings and performance of  selected equipments  and proposed design as  per the prescribed Technical  Standards  w.e.f.  01/04/2010 vide notifications F.  No. 45­64/2010­Hort  dated
25.02.2010. 
7.  That I undertake to adhere to the requirements of confidentiality and non­compete with respect to proprietary information entrusted to me by the promoter/manufacturer of equipment / the Board.8.  That I will assist  the Government inspection and regulatory  agency  during stage
inspection of the project and provide any/or all technical clarifications as and when
required. 
9.  That I will furnish a certificate of satisfactory commissioning of the cooling system in  conformance to the performance indicators as per the prescribed standards. 
10.  That in case of any concealment of facts by me in the DPR with respect to invariable  compliance to Technical  Standards  or on any  instance of false  declaration /  certification by me or any part of my declaration is found to be incorrect, the Board may, in its discretion, take any actions (including legal action) against me as deemed
fit and proper.
IN WITNESS WHEREOF, the consultant has signed this declaration and certification on
this ____ day of ____ 2010 in the presence of the following witnesses;  WITNESSES: 
1. 
(Sign of the Consultant)  2.FORMAT – IV 
Basic Data Sheet 
A. Identification Name of Cold Storage
Location of Cold Storage Area / Village Town 
District  State
Name of Promoter Company / Owner
Type of company 
(Proprietorship / Partnership / Pvt. Ltd / Ltd)
Postal address of Promoter
Tel / Fax  Mob. No  E­mail
Present activity in brief
Name of CEO / MD 
Name of Manager / Contact Person  Phone / Mobile No
B. Basic Cold Store Design Considerations 
i) Commodity Storage Requirements
Type of Commodities/Produce
Ideal / Recommended Storage Conditions  –  Temperature (DB in O C)–  Humidity RH (%) Range –  Air Circulation (CMH/MT of Produce) –  Ventilation (Air Changes/Day) –  CO2 Range (PPM)  –  Produce Cooling Rate ( O C/day) –  Freezing Point O C
–  Others  Cold Chamber Dry bulb (DB in O C)
Cold Chamber RH (%) Max Storage period (months)  Max product temp (O C) – at the time of loading  Daily loading rate (MT/day) –  in each cold chamber Loading Period  (months) 
Pull down rate (O C / day)
Unloading Period (months) 
Daily unloading rate (MT/day) –  from each cold chamber Ante Room Conditions (T O C & RH %)
Sorting & Grading Area (T O C & RH %)
Special Provisions  –  CIPC treatment for Process Potatoes  Special Provisions – MA / Ethylene Control /  Fumigation/ Fresh Air etc
ii) Fresh Air / Ventilation System
Brief Description of CO2 Extraction /  Ventilation System  CO2 Concentration Control Range (PPM)  Monitoring & Control Instrument  –  Type –  Accuracy  Ventilation Capacity (Max Air Changes/Day)Design Considerations for Energy Recovery and  Preventing Wetting of Produce
iii) Cold Store Chamber Sizing and Capacity 
­ No. of chambers:  ­ Type  : Mezzanine/ Palletized  ­ Max Height of Building
Details  CSC 1  CSC 2  CSC 3  CSC 4
Total Capacity of Each Cold Store Chamber ( MT)
Internal Chamber Dimensions  L x  B x H  (m) No. of mezzanine floors  X Height (m) per floor Size &Weight of Bags or Boxes being  stored  Total number of Bags/Boxes stored in  each Cold Store Chamber
iv) Ante Room & Process Areas
Details  Length (m) Width (m) Height (m)
Ante Room 
Sorting & Grading Area
Loading / Unloading dock
v) Machine Room & Utility Areas
Details  Length (m) Width (m) Height (m) Machine RoomOffice Area
Toilets & Changing rooms 
Any other
vi) Building & Construction Details
– Type of construction : Civil/  Pre­engineered Building 
Type of External walls of cold  chambers  Type of Internal / Partition walls 
Type of Roof / Ceiling 
Type of Internal structure / Racks 
Type of mezzanine grating 
Types of Lighting fixtures in cold  Chambers  Types of Lighting fixtures in  Process & Other Areas
vii) Insulation and Vapor Barrier
– Type of Insulation : Insulating Sheets /  Metal Skin Composite panels
Type of Insulation Wall External  Internal  Ceiling / Roof Floor
Type of material  EPS / Metal Skin PUF Composite Panels / XPS/ PUR, Others  Relevant IS Code
Density  (kg/m 3) Thermal Conductivity at +10°C
k value ( W/m.K) Thermal diffusivity m2/h  Water vapour transmission rate, ng/Pa.sm, Max. Water absorption after 24himmersion, percentage by mass. Relevant IS Code of Practice for Thermal Insulation of Cold Store Total Insulation Thickness (mm) No. of layers &  Thickness / layer (mm) Type of vapor barrier & thickness 
(microns)  Type of Bituminous/Sticking  Compound  Type of Cladding /  Covering/External Finish  Locking/Fixing & Sealing System in  case of Metal Skin Composite Panels  Any other info
viii) Cold Store Doors & Air Curtains 
Type of Insulation Details
No. of Insulated doors 
Type hinged / sliding 
Insulation Material  EPS / PUF / Others  Thickness of Insulation (mm)
Type of cladding 
Size of door opening 
Provision of Strip curtains – nos. &  overlap %
Air curtains, if any 
Othersix) Material Handling
– Proposed Practice : Manual / Semi Automated /Automated
Procedure Brief Description Material Handling Procedures  & Equipments Cap of Electric Elevator Rating of motor (kW) Any other device
x) Grading, Sorting Washing & Packing Line (optional) – Proposed Practice : Manual / Semi Automated /Automated
Procedure Brief Description
Process Line
Total Connected Load (kW)
Please  attach  a Plan  & Layout of the proposed  Cold  Store  unit in accordance to the  Statutory  Building By­Laws and BIS Building Codes & Standards duly approved by a Registered Architect and Structural Engineer. The  drawings should  detail out insulation type, thickness, and fixing  methodology in sectional details.
C. Heat Load Calculation of Cooling System – Summary 
Ambient Conditions  Summer Monsoon Winter
Dry Bulb Temperature (°C) Wet Bulb Temperature (°C)
Refrigeration Load During Loading 
(kW) During Pull Down
(kW) During Holding 
(kW) Transmission Load 
Product Load 
Internal  Lighting loadLoad  Occupancy load 
Infiltration Load 
Ventilation/ Fresh Air Load 
Equipment Load ­ Fan motors etc. 
Total Load (kW/24 hrs) 
Loading Period  Pull Down Period Compressor Operation Hours/Day Holding period  Multipliers Safety Factor Defrost Period
Total Refrigeration Load Peak Period Holding Period Lean Period
Total Load (KW)
Please attach detailed heat load calculation sheets of the proposed cold store unit in accordance to 
the prescribed Technical Standards and Guidelines duly approved by a Qualified Engineer.
D. Cooling System Design & Equipment Selection
i) Cooling System Configuration
Type of Refrigerant  Ammonia /Freon /Others 
Type of System  Direct Exp / Gravity Feed / Overfeed 
Type of compressor Reciprocating  /  Screw  / Scroll / Others 
Type of capacity control  Automatic In steps  /  Step less 
Type of condenser Atmospheric / Evaporative / Shell & Tube / Plate Heat  Exchanger /  Other Cooling Towers ( if applicable) FRP Induced Draft / OthersType of cooling coil  Ceiling suspended  /  Floor Mounted / Others 
Type of defrosting  Air / Water /  Electric /  Hot gas 
Humidification System & Control 
( Brief Description)
ii) Compressor Detail
Compressor Make &  Model 
Nos. Comp. RPM  Operating  Parameters Evap. SST. / Cond. Temp 
(O C)
Refrigeration  Capacity 
(KW)
Motor Rating.
(KW)
Total  Electric Power.
(BkW)
Remarks  Working 
/Standby
iii) Condenser Details
Condenser Make &  Model 
Nos. Operating Parameters  Cond.Temp.(SDT)/ 
in/out water temp(O C) &flow (lps) 
Condenser Capacity 
(kW)
Electric Fan 
/Pump Motor Rating 
(kW)
Total  Electric Power
(BkW)
Remarks Working 
/Standbyiv) Cooling Tower Details ( if applicable)
Cooling  Tower Make &  Model 
Nos. Operating  Parameters DB &  WB Temp, in/out  water temp(O C)
Cooling Tower Capacity(KW) Fan & Pump  Capacity 
(CMH/LPS) &  Motor (kW)
Total  Electric Power
(BkW)
Remarks Working 
/Standby
v) Air Cooling Units (ACU)
ACU  Make &  Model 
Nos. Operating  Parameters Evap.
(SST) & TD* (O C)
Cooling  Capacity 
(kW)
Air Flow 
(CMH) &  Face Velocity 
(M/S)
Material of Coil Tubes  & Fins 
Fin pitch 
(mm) Total Fan  Electric Power
(BKW)
(*) TD  – Temperature  difference between Evap.  (SST) O C & Return Air (at coil inlet).
Please attach  Detailed  Technical Data  Sheets of each  equipment namely  Compressors, Condensers, Cooling Towers, Air Cooling Units giving General Layout, Dimensions, Material of Construction, Rated Capacity, Operating Parameters and COP (please note that the Air Cooling  Unit data sheet should include heat transfer area, fin spacing, no. of rows, air flow, face velocity,
fan static, air throw, Fan  Motor BKW/KW, fin spacing, etc  ) duly  Certified  by  the  respective  equipment manufacturers with reference to the Relevant Codes & Standards.E. Electrical Instillation
Total Connected load (kW)
Estimated power requirement  at  Peak Load Period (BkW)
Estimated power requirement  at  Holding Load Period (BkW)
Estimated power requirement  at Lean  Load Period (BkW)
Capacity of Transformer (KVA)
(proposed) Size of Capacitor for power factor correction  & their operation  Make & Capacity of standby  D.G.Set (KVA)
F. Safety Provisions
Details of Fire Fighting equipment  Dry  Water based 
Handling  Refrigerants & Leaks  Leak Detection  Handling measures 
Safety devices – LP/HP cutouts, safety valves, shut off valves etc.  Details of Emergency alarm system  & push button system in cold chambers  Emergency lighting in Cold chambers & other areas 
Lightening arrestors 
Any other safety provisions
G. Codes & Standards FollowedBuilding Design & Structure
Construction Materials 
Thermal Insulation & Application 
Refrigeration Equipment & Systems 
Electrical & Mechanical Systems 
Food Safety 
Others
H. Energy Saving Equipment & Measures
Details of Energy Saving devices  Brief Description and Savings Light Fixtures CFL/LED
Natural Lighting for general areas 
VFD for fans / compressors 
Refrigerant Controls and Automation 
Air Purger
Power Factor Controller
Energy recovery heat­exchanger for Ventilation  System  Renewable/ Solar Energy e.g. PV lighting  PLC Control, & Data Acquisition 
Any other features e.g. water recycling,
rain water harvesting …
I. Operation & MaintenanceDescription Nos. / Details
Proposed staff for Operation & Maintenance
Proposed Annual Maintenance Contracts (if any)
Training & Preventive Maintenance procedures 
Sanitation & Hygiene practice
Pollution Control
J. Estimated Performance Parameters of Proposed Cold Store 
Parameters  Peak Period Holding Period Lean Period
Coefficient Of Performance (COP)  Of the Cold Store Unit 
Power Consumption (KWH/Day)
Total Electricity Cost (Rs/Day)
Electricity Cost towards Storage (Rs/ MT /Day)
K. Other Information
Place  Signature and  Date  Name of Applicant with sealFORMAT­V 
NATIONAL HORTICULTURE BOARD  Progresses Report
(Pre­Inspection Report) Date of Inspection: 
1. (i) Name of the project 
(ii) Address for communication  with telephone No.
(iii) Project location with address
(iv) Constitution (Individual/ Joint 
Individual/Partnership Firm/  Company.
(v) Status of Land right with land  specification – Khasra No. Khatoni etc 
(own land in the name of applicant/Regd. Lease land in the  name of applicant or else, please  specify) 2. Proposed Activity 
Type  Proposed type of cooling system 
Cold Store 
CS1 / CS2 / CS3 
3. Project Cost & Mean of finance
4. Present physical status of the project  4A. Date of start 
(i) Land development  status/boundary/road 
(ii) Connecting road to the plot 
(iii) Stage of cold store building  civil/pre engineered as on 
inspection date 
(iv) Installation of power
transformer/electricity supply  equipment 
(v) Installation of Refrigeration  cooling system 
(vi) Type of produce proposed to be  stored 
(vii) Whether cold storage is
functioning.
Remarks (in detail) ÿ
ÿ
ÿ
ÿ
ÿ
ÿ
ÿ5. If any subsidy is given by the Board  earlier for any cold storage project, the  details of applicant, purpose, year and  amount of subsidy may please  be 
indicated  6. Status of previous project if any.
7. Remarks of inspecting officer 8. Whether promoter has approached the  Bank/FI for term loan, if yes, the  month thereof (Name  of Bank  with  address, Branch Code  No. & phone  No.
If the  cold  storage is under  construction, the  details of expenditure made as on date. 
(i) From applicant share 
(ii) From Bank Loan 
Yes/No 
9. Recommendation of Pre  Inspecting  Officer  10. Permission for cold  storage
consideration/decision from the 
relevant Authority
Signature of Inspecting Officer 
(Full Name & Seal)


28 July 2013 thank u sir...can u pls mail me the soft copy in excel format as this is beneficial for me to take out extracts...

thank u sir...



You need to be the querist or approved CAclub expert to take part in this query .
Click here to login now

CAclubindia's WhatsApp Groups Link


Similar Resolved Queries


loading


Unanswered Queries