16 November 2007 Can anybody provide me Profarma of Internal Control of Power generating Company based on wastage?

19 November 2007 USUAL PARAMETERS IN INT. CONTROL OF WASTE POWER PROD. UNITS ARE AS STATED BELOW.

1.Project Emissions levels due to transportation of waste to processing plants,( fly ash to brick manufacturers
and transport of fluff)

2. average incremental distance for waste transporation (tonnes/truck)
3. what is the average CO2 emission factor for the trucks measured
4. the quantity of waste combusted in the year
5.quantity of combustion residues produced in the year (tonnes)
6.average truck capacity for combustion residues transporation (tonnes/truck)
7.average distance for combustion residues transporation (km/truck)
8. Project Emissions due to grid electricity consumption in processing plants calculated based on
electricity consumption at both processing plants (measured with the installed energy meters and
documented) and emission factor.
9.Measures to ensure the Results / uncertainty analysis
10.As per the Power Purchase Agreement (PPA), the energy exported to the Grid recorded from two independent meters viz., Main Meter and Check Meter and reading of main meter is used for
billing. In the event of main meter not in operation / fails, the reading of the check meter if used
for Billing.
11.The calibration of monitoring equipment IF maintained as per the requirement of regulatory agency like APTRANSCO.
12.Power Generation, Export & Auxiliary Consumption, fuel consumption if
recorded daily and the same is being verified by Manager (O&M) and approved by General Manager
(Operation).
13.Power Generation, Export & Fuel Consumption Month-wise data on Power Generation, export, import, fuel consumption and diesel consumption for the monitoring period:Month/ Year

14.Quantity of waste processed in theplant

Quantity of waste combusted /plastic combusted / organic and inorganic materials combusted

Composition of waste processed
Composition of waste combusted PowerGeneration (kWh)PowerExport
SUCH PARAMETERS ARE COMPARED QUARTER ON QUARTER BASIS TO CHECK CONSISTENCY AND VARIANCE ANANLYSIS MADE FOR FUTURE CONTROLS AND TO IMPROVE PRODUCTIVITY AND PROFITABILITY.
COST BENEFIT ANALYSIS IS MADE TO MEASURE CAPITAL EXP. BENEFITS.
UNIT POWER PRODUCED COST COMPARED WITH SALE RATE OF UNIT OF POWER TO ASCERTAIN BREAK EVEN POINT .
R.V.RAO



You need to be the querist or approved CAclub expert to take part in this query .
Click here to login now



Similar Resolved Queries


loading


Unanswered Queries



CCI Pro

Follow us
add to google news


Answer Query



Company
ARTICLESHIP 09 June 2026
Article Trainee

Numbertree LLP

Mumbai

CA Inter

View Details
Company
ARTICLESHIP 20 June 2026
Articleship

RB KESHRI & CO

Mumbai

B.Com

View Details
Company
Featured 24 June 2026
HEAD - AUDIT AND TAXATION

A R JADHAV AND ASSOCIATES

Mumbai

CA Inter

View Details
Company
ARTICLESHIP 27 June 2026
CA Articled Trainee And Paid Assistant

SKAA & Associates

New Delhi

CA Inter

View Details
Company
29 June 2026
ACCOUNTANT

SANDEEP AASHISH & CO

Araria

B.Com

View Details
Company
ARTICLESHIP 27 June 2026
Article

SNCO

Mumbai

CA Inter

View Details
Company
29 June 2026
Accountant (Finance & Compliance)

TRIEYEZ

Kolkata

CA

View Details
Company
ARTICLESHIP 30 June 2026
Article Assistant or Paid Assistant

VIKAS VERMA & CO

New Delhi

Others

View Details