Executive Summary
- Solar EPC contracts executed before 1 January 2019 could not be compulsorily valued on the later 70:30 goods-services formula.
- A solar power generating system detachable from its foundation remained movable; its installation was not necessarily a works contract.
- Circular No. 163/19/2021-GST offered an option for the earlier period; it did not retrospectively impose a tax burden.
- Section 74 could not be invoked merely by labelling the earlier classification as suppression.

1. The Issue
Sterling and Wilson supplied and installed solar power generating systems under turnkey EPC contracts between 1 July 2017 and 31 December 2018. It discharged GST at 5%, treating the solar power generating system as goods covered by Serial No. 234 of Schedule I to Notification No. 1/2017-Central Tax (Rate).
The Department treated the contracts as works contracts. It invoked the post-1 January 2019 valuation mechanism introduced by Notification No. 24/2018-Central Tax (Rate): 70% of gross consideration as goods taxable at 5%, and 30% as services taxable at 18%. The adjudication order also alleged wilful misstatement and suppression, invoking Section 74 of the CGST Act, 2017, and imposed tax and penalties aggregating to ₹53.35 crore.
The Supreme Court had to decide three interlinked questions: whether the installed system was immovable property; whether the 70:30 formula applied compulsorily to the pre-2019 period; and whether the facts justified extended limitation.
2. Department's Arguments
The Revenue contended that the turnkey contract contained supply, installation and civil-work elements. Since solar systems were installed at permanent locations on foundations and could not be shifted without dismantling, the end-product was immovable property. The contract was therefore a works contract under Section 2(119), not a supply of goods taxable wholly at 5%.
The Department further treated Circular No. 163/19/2021-GST as requiring application of the 70:30 formula to the earlier period. On that footing, it characterised the assessee’s 5% classification as deliberate misclassification and suppression attracting Section 74 and penalty under Section 122(2)(b).
3. Assessee's Arguments
The assessee submitted that an EPC contract can be a composite supply without becoming a works contract. The statutory dividing line is whether the contract culminates in immovable property. The solar modules and associated system were detachable from the civil foundation and capable of use elsewhere; the foundation existed to stabilise the system, not for its own beneficial enjoyment.
It relied upon the Andhra Pradesh High Court’s earlier decision in its own case, Sterling and Wilson Pvt. Ltd. v Joint Commissioner, State Tax, Vijayawada, which had accepted this distinction. It also submitted that the 70:30 valuation mechanism entered the statute book only from 1 January 2019. Circular No. 163/19/2021-GST merely allowed, but did not compel, taxpayers to adopt it for prior solar-project supplies.
4. Holding and Reasoning
The Supreme Court allowed the appeal and set aside the adjudication order and consequential summary order (paragraph 40).
On classification, the Court held that civil-work content in an EPC contract does not automatically make the contract a works contract (paragraph 35). Every works contract is a composite supply; the converse is untrue. A works contract under Section 2(119) requires activity concerning immovable property as the end-product (paragraph 36).
The system was detachable from the foundation and usable elsewhere. Its fixation served its own stability and operational efficiency; it did not secure the permanent beneficial enjoyment of the civil foundation. Therefore, attachment to something embedded in earth did not, by itself, convert the system into immovable property (paragraphs 35–36). indiankanoon. org
On valuation, the Court held that Notification No. 24/2018 created the 70:30 regime only from 1 January 2019. Circular No. 163/19/2021-GST used the word “can”; it gave assessees an option to apply that mechanism to supplies between 1 July 2017 and 31 December 2018. It did not impose the mechanism upon those who had not chosen it (paragraphs 33–34). The Court also treated the later substitution of “solar power generating system” with “solar power generator” as confirming a distinct, earlier tax treatment rather than authorising retrospective reclassification (paragraphs 37–39). indiankanoon. org
Finally, the Court applied its recent reasoning in Tata Steel Ltd. v Union of India: Section 74 requires foundational facts in the SCN from which fraud, wilful misstatement or suppression can rationally be inferred. A subsequently introduced valuation formula could not supply the basis for alleging suppression in respect of an earlier period (paragraph 34).
5. Then and Now: The Pre-GST Lineage
The judgement carries forward the Central Excise test in Commissioner of Central Excise v Solid & Correct Engineering Works. There, the Supreme Court held that plant bolted to a foundation merely for stability and vibration-free functioning did not become immovable property. The relevant inquiry is neither physical attachment alone nor the difficulty of removal; it is the nature, object and permanence of annexation.
GST has modified the consequence, not the property-law inquiry. Under Central Excise, the movable-immovable distinction principally informed manufacture and excisability. Under GST, it determines whether a composite supply crosses into the specific definition of a works contract, thereby affecting rate, place-of-supply consequences and ITC treatment. The Court’s approach correctly prevents the statutory definition of works contract from swallowing every installed industrial asset.
6. Allied Law Lens
The Court’s reasoning draws directly from Section 3 of the Transfer of Property Act, 1882 and Section 3(26) of the General Clauses Act, 1897. The useful distinction is between attachment for permanent beneficial enjoyment of land or foundation, and attachment that merely enables the equipment itself to function safely and efficiently.
That distinction makes project documentation commercially important. A contract clause describing dismantling, relocation, reuse, residual value and site-restoration can become classification evidence, not merely boilerplate.
7. Analysis and Conclusion
The Court has done more than settle a solar-sector rate dispute. It has restored the statutory sequence. Classification first requires identification of the supply; valuation follows only under the law applicable when that supply occurred. The Department’s approach reversed that order by importing a later deeming formula and then using the imported result to allege suppression.
The decision is persuasive beyond solar EPC. Wind generators, battery-storage systems, modular process equipment and telecom infrastructure may raise the same question where foundations are designed for equipment stability rather than permanent accession to land.
The caveat is factual. Detachability must be real, not theoretical. Where the contract, engineering design and post-installation conduct show that the asset is intended as a permanent addition to immovable property, the conclusion may differ. But where the Revenue proposes a retrospective rate reconstruction, Sterling and Wilson requires it to establish both the statutory basis and the factual predicate before invoking Section 74.
8. Practice Tips
- Segregate the EPC scope into equipment, installation, civil works, commissioning and site services; do not rely only on the contract title.
- Preserve engineering drawings, foundation specifications, dismantling manuals, relocation records and asset-register descriptions showing detachability.
- For pre-2019 renewable-energy projects, map invoices and tax positions against the applicable notification on the supply date, not later valuation explanations.
- Challenge any Section 74 SCN that merely repeats “suppression” without identifying the foundational facts and the alleged deliberate device.
- In comparable matters, plead both alternatives: the contract is not a works contract; independently, the 70:30 formula was not mandatory before 1 January 2019.
References
- M/s Sterling and Wilson Pvt. Ltd. v Union of India and Others, 2026 INSC 1222, Civil Appeal arising from SLP (C) No. 23844 of 2025, decided on 16 November 2026.
- Commissioner of Central Excise, Ahmedabad v Solid & Correct Engineering Works, (2010) 5 SCC 122; 2010 (252) ELT 481 (SC).
- Tata Steel Ltd. v Union of India, 2026 INSC 920, decided on 25 August 2026.
- Sterling and Wilson Pvt. Ltd. v Joint Commissioner, State Tax, Vijayawada, (2025) 26 Centax 301 (AP); 2025 (95) GSTL 402 (AP).
- Notification No. 1/2017-Central Tax (Rate), dated 28 June 2017.
- Notification No. 11/2017-Central Tax (Rate), dated 28 June 2017.
- Notification No. 24/2018-Central Tax (Rate), dated 31 December 2018.
- Notification No. 8/2021-Central Tax (Rate), dated 30 September 2021.
- Circular No. 163/19/2021-GST, dated 6 October 2021.
Case Snapshot
- Case name: M/s Sterling and Wilson Pvt. Ltd. v Union of India
- Court and Bench: Supreme Court of India; Sanjay Kumar and Sanjeev Sachdeva JJ.
- Case type and number: Civil Appeal arising from SLP (C) No. 23844 of 2025
- Date of judgment: 16 November 2026
- Neutral citation: 2026 INSC 1222
- Provisions involved: Sections 2(30), 2(119), 8, 9, 15, 74, 122(2)(b) and 168 of the CGST Act, 2017; Notification Nos. 1/2017-Central Tax (Rate), 11/2017-Central Tax (Rate), 24/2018-Central Tax (Rate), 8/2021-Central Tax (Rate); Circular No. 163/19/2021-GST dated 6 October 2021.
Disclaimer
This article reflects the author’s views and is not legal advice.