On 16 November 2026 the Supreme Court set aside a GST demand of ₹53.36 crore, including penalties, in a solar EPC case. The ruling clarifies when the 70:30 split between goods and services can be imposed.
The 70:30 rule
For solar power generating systems, an explanation inserted from 1 January 2019 (Notification 24/2018-CT(Rate), with the service entry in 27/2018-CT(Rate)) deems 70% of the gross consideration to be goods and 30% to be services. At the then-applicable rates of 5% and 18%, that produces an effective 8.9%.

The Dispute
The assessee supplied and installed solar systems under EPC contracts between 1 July 2017 and 31 December 2018 , paying 5% under Serial No. 234 of Notification 1/2017-CT(Rate). The department said the 70:30 mechanism applied, producing the 8.9% effective rate and a demand with penalty under section 74. A show-cause notice came in 2023 and adjudication in January 2025. The Bombay High Court dismissed the writ petition citing the alternative remedy, and the Supreme Court took the matter up.
What the Court held (as reported)
- Writ was maintainable. The alternative-remedy rule is not inflexible.
- The original entry covered the whole system. Serial No. 234 named the solar power generating system as a whole, and the 5% rate reflected a policy to encourage renewable energy.
- 70:30 is prospective. It took effect on 1 January 2019 and doesn’t apply backwards to earlier supplies.
- The 2021 circular gave an option. Circular 163/19/2021-GST (6 October 2021) allowed taxpayers to use 70:30 for 1 July 2017 to 31 December 2018. That is a choice for the taxpayer, not a power for the department to impose it. The circular also said no refund where tax already paid was higher.
- Civil work does not make it a works contract. A works contract needs immovable property. Panels that can be detached and moved, fixed to a foundation only for stability, don’t become immovable by that fact. The Court applied the tests of nature and purpose of annexation, intention, and dismantling without damage.
- Extended limitation fails. There was no basis for fraud or suppression for not applying a mechanism that did not yet exist. Referring to Tata Steel , the foundational facts for section 74 must appear in the notice itself.
- Later rate changes don't apply backwards. The substitution of the entry in September 2021 supported reading the earlier entry as covering the whole system.
Illustration from the judgment
On a ₹10,000 supply, the earlier 5% treatment gave ₹500. Under 70:30, 5% on ₹7,000 is ₹350 and 18% on ₹3,000 is ₹540, a total of ₹890.
What it does not settle
- It concerns pre-2019 periods. For 2019 onwards, the Andhra Pradesh High Court (2026) held that the 70:30 mechanism is mandatory and that separate invoices for goods and services don’t take a supplier out of it. The Gujarat High Court (October 2026) quashed a section 74 notice for FY 2018-19 on the ground that retrospective application of 70:30 does not itself show fraud or suppression.
- Rates have changed over time, including in the GST 2.0 changes, so recompute for each period.
- Classification depends on the contract and installation facts.
Checklist
- Split open matters into three periods: before 1 January 2019, 2019 to date, and the circular’s option window.
- Don’t concede 70:30 for the earlier period without checking whether you elected it.
- Review contracts and invoices for the separate-invoice point.
- Challenge section 74 demands where the notice doesn’t state its foundational facts.
Bottom Line
For 2017 to 2018 supplies, 70:30 is an option the taxpayer may take, not a rule the department can impose.
You have reached your daily limit of 2 Free Articles
Subscribe to CCI PRO for unlimited access
Why Upgrade to CCI PRO?
- No Ads
- WhatsApp Community
- Daily E-Newsletter
- Unlimited Articles Access
- Profile Visitors
- Link Social Profiles
- Featured Job Posts
- Pro Badge
- Expert GST Guidance
- Unlimited Forum Replies
- Download Content in PDF
Already a PRO member? Login here for an ad-free experience. 07941056694