paper is lengthy, time consuming, new questions mostly nd overall not good. only 50+ those students think if they prepared really enough good.
Hey guys, leave AMA for now, paper was overall difficult for most people i think. So valuation will be liberal. So dont worry now. Study ISCA.

it was so lengthy and mostly all concepts ask in qstn are new..not from PM

All questions were new but once started solving, they all were solving. There were some tricky questions but reading slowly was the key. My Roll No. Is 109788 & I'm sure to get minimum 75. My first attempt

yes

paper was easy as compared to group 1
question from or were easier and conceptual
theory question was from pm
Study material and practice manual se tha kya????
What are your views when answers are right but there are cuttings in paper.. .like ist cut whole ans.. Then do it again on next page?
for network sum... it is tricky with some basic conceptualities.. one is find out avtivity time with EST EFT diff, than look at EFT and based on that construct network. because EFT is nothing but previous event total time of critical path and if u get it.. all sum is easy.
What is the answer to 1(c)
Overall avg attempt of AMA may be 80% because question came around 35% marks was wholly new one and the same takes time to finish it. 

Also, rest of parts they asked was remain in a comfort to attempt.

Today's my attempt was 78 marks out of which Q 1 Q 2 Q 4 Q 7 Q 5 b was attempted well & Q 3a was so so,,,,,,,,!!

and Q 3 b not attempted
and Q 5 a not attempted

Q 6 drop as under choice attempt any of the rest option.

Overall attempt was average. Therefore, now to grip up ourself for ISCA DT and IDT.

It is hope that ICAI will not put tough marking as question paper was overall not easy as we can say.

Good Luck to all for ISCA.
Network problem was purely coceptual. critical path is identified by using total float. when Total float is Zero that activities can form part of critical path