PROJECT REPORT

4311 views 3 replies

I want sample project report to submit to bank, required for increase of CC limit

 

Replies (3)

Im giving some details for new project...help for this...Before setting up the project, it is necessary to assess the market potential for the goods proposed to be manufactured. These reports answer the most frequently asked questions on all the aspects of a new project such as:

  1. Introduction
  2. Properties
  3. Uses & Application
  4. B.I.S. Specifications
  5. Market Survey
  6. Raw Materials
  7. Manufacturing Process
  8. Process Descripttion
  9. Process Flow Diagram
  10. Plant Layout
  11. Details of Plant & Machinery
  12. Suppliers of Raw Materials
  13. Suppliers of Plant & Machinery
  14. Principles of Plant Layout
  15. Plant Location Factors
  16. List of State Industrial Development Corporations (which provide financial and other incentives)
  17. Suggested Steps
  18. Plant Economics
  19. Land and Building Costs
  20. Plant and Machinery Costs
  21. Other Fixed Assets
  22. Fixed Capital Investment
  23. Raw Material Costs
  24. Salaries and Wages
  25. Utilities and Overheads
  26. Total Working Capital
  27. Cost of Project
  28. Total Capital Investment
  29. Cost of Production
  30. Turnover per Annum
  31. Profitability Analysis
  32. 5-year Profit Analysis
  33. Break-even Point
  34. Resources of Finance
  35. Interest Installment Chart
  36. Depreciation Chart
  37. Cash Flow Statement
  38. Projected Balance Sheet

Please note:

  • These project reports contain general guidelines for the promoters of new projects.

  • They are based on small factory considerations. Bigger manufacturing units will obviously entail higher costs than indicated in these reports.

  • Cost of land (or rent for buildings) mentioned in each of these reports is only indicative. This is because the cost of land (or rent) varies from place to place, and also depends on the incentives given by the industrial development authorities in the state or zone concerned.

  • Costs of machinery mentioned in the reports are rough estimates and are only indicative of machinery manufactured and/or procured within India.

Hi

For increasing the cc limit ( i.e. enhancement in exsisting credit facility ) you need to submit the revised CMA data to your Bank.

Im not remembering the exact date but someone has posted the spreadsheet of CMA data on this portal in the first week of Sept'2008. If you have a spare time you can trace out that particular posting. That sheet is  accepted by almost all the banks. I have also downloaded same sheet and submit it to my bank for enhancing the term loan limit.

Amit

PLEASE SEND ME PROJECT REPORT EXCEL FORMAT


CCI Pro

Leave a Reply

Your are not logged in . Please login to post replies

Click here to Login / Register