Advocate- Tax
7806 Points
Joined December 2008
If it is a composite supply, it needs to be classified as per nature of principal supply as per Section 8(a) of the CGST Bill.
In some of the work contracts supply of goods is principal, i.e. composite supply of airconditioner with its installation. It shall be treated as supply of goods. There may be ceratin supplies where goods are not important, it is the installation/construction is paramount and principal- i.e. construction of a building.
I am sure in due course proper classification guidelines shall be issued.