My friend intends to apply for Village Panchayat approval for the proposed factory, in Tamilnadu. The authorities of the Village panchayat informed him to submit the estimated cost of the proposed building so as to arrive at 1% of construction cost,  to make  in terms of Tamil Nadu Manual Workers (Regulation of Employment and Conditions of Work) Act, 1982 (No.33 of 1982). 

In this regard, Could anyone update me regarding the minimum construction cost per square feet ( prescribed if any, by the construction labour welfare board or labour department of Tamilbnadu ) for a commercial building w.r.t payment of  cess, as per Tamil Nadu Manual Workers (Regulation of Employment and Conditions of Work) Act, 1982 (No.33 of 1982).

 

 

Replies (1)

Under the Tamil Nadu Manual Workers (Regulation of Employment and Conditions of Work) Act, 1982, every person applying for a building permit must pay a contribution to the welfare fund for manual workers in construction. This contribution is capped at 1% of the total estimated cost of the construction. The estimated cost must be certified by a prescribed authority to ensure accuracy .Indian Kanoon+2Scribd+2

While the Act does not specify a minimum construction cost per square foot, local authorities often refer to standard construction cost guidelines to determine the estimated cost. For instance, in Tamil Nadu, construction costs typically range from ₹1,500 to ₹5,000 per square foot, depending on the quality of materials and finishes .NoBroker

Steps to Determine the Contribution:

  1. Obtain a Detailed Estimate: Prepare a detailed estimate of the construction cost, including materials, labor, and other expenses.

  2. Certification: Get the estimate certified by a qualified authority, such as a registered architect or engineer, as required by the local panchayat.

  3. Calculate the Contribution: Multiply the certified estimated cost by 1% to determine the contribution amount.Scribd+1

  4. Submit with Application: Include the certified estimate and the calculated contribution amount when applying for the building permit.