Burj Khalifa

 

 

Burj Khalifa , formerly known as Burj Dubai, is a skyscraper in Dubai, United Arab Emirates, and the tallest man-made structure ever built, at 828 m (2,717 ft). Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010. The building is part of the 2 km2 (490-acre) flagship development called Downtown Burj Khalifa at the “First Interchange” along Sheikh Zayed Road, near Dubai’s main business district.
The tower’s architecture and engineering were performed by Skidmore, Owings, and Merrill of Chicago. Adrian Smith, who worked with Skidmore, Owings and Merrill until 2006, was the chief architect, and Bill Baker was the chief structural engineer for the project. The primary contractor was Samsung C&T of South Korea, who also built the Taipei 101 and Petronas Twin Towers. Major subcontractors included Belgian group Besix and Arabtec from the UAE. Turner Construction Company was chosen as the construction project manager. Under UAE law, the Contractor and the Engineer of Record, Hyder Consulting, is jointly and severally liable for the performance of Burj Khalifa.
The total cost for the Burj Khalifa project was about US$1.5 billion; and for the entire new “Downtown Dubai”, US$20 billion. Mohamed Ali Alabbar, the Chairman of Emaar Properties, speaking at the Council on Tall Buildings and Urban Habitat 8th World Congress, said in March 2009 that the price of office space at Burj Khalifa had reached US$4,000 per sq ft (over US$43,000 per m2) and that the Armani Residences, also in Burj Khalifa, were selling for US$3,500 per sq ft (over US$37,500 per m2). The completion of the tower coincided with a worldwide economic slump and overbuilding, causing it to be described as “the latest … in string of monuments to architectural vacancy.”

Replies (2)

yaar do word agar india par likhte to shayad mujhe kya sabko achha lagta

 

par itna bhi bura nahi hai

Sir,,,, India pe bhi kafi post kiye hai........

Leave a Reply

Your are not logged in . Please login to post replies

Click here to Login / Register  

Company
08 October 2026
SALES TELECALLER

HIRE NOVA

Lucknow

Graduate (Any)

View Details
Company
ARTICLESHIP 16 September 2026
Article Assistant

MANUJ SHARMA AND COMPANY

Noida

CA Inter

View Details
Company
ARTICLESHIP 18 September 2026
Industrial Trainee

Twenty Point Nine Five Ventures Private Limited

Noida

CA Inter

View Details
Company
07 October 2026
Senior Account Manager

Amplio Invest

Mumbai

M.Com

View Details
Company
30 September 2026
Senior Accountant

Codeboard Technology

Chennai

B.Com

View Details
Company
ARTICLESHIP 01 October 2026
Articled Assistant

KPSN & Associates LLP

Chennai

CA Inter

View Details
Company
20 September 2026
Semi Qualified CA

Navin & Associates

Mumbai

CA Inter

View Details
Company
19 September 2026
CA/Semi-CA/BCom

Pravin Sarvaiya

Mumbai

CA Inter

View Details