What is the turn over limit for building contractor

224 views 4 replies
20 lacks ya 40 lacks
with material or without material
Replies (4)
Regarding which aft?
Works contract is a supply of service as per schedule 2 therefore 20 lakhs limit is applicable
Works contract has seperate requirement.

The limit for registration is of Rs 20 lakhs 


CCI Pro

Leave a Reply

Your are not logged in . Please login to post replies

Click here to Login / Register