I have contracted on vendor abc enterprises for laying out 11 kv transmission line and and a bay structure for my 1 mw solar power plant. Total cost is 35L (material and labour). I paid him 39L. Actually 58L but 10L I got returned by him. When he charge me a GST, should he charge me 18% or 8.9% (using 70 30 rule) under HSN 8541 and HSN 9954