an assessee is engaged in construction business. he paid 159360 including st @ 12.36% for structural fabrication erection with painting of pump for plant. now ca he claim credit of st paid.
an assessee is engaged in construction business. he paid 159360 including st @ 12.36% for structural fabrication erection with painting of pump for plant. now ca he claim credit of st paid.