we are doing residential construction business. In it earth work we paid on contract basis to jcb work as "Rs.per cubic meter". weather we are liable to tds us194 c or 194 i ?
if we take j.c.b on hire then we can say it comes u/s 194 I but here we not taken j.c.b on hourly hire basis but we paid them in the form of measuring the cubic meters worked by j.c.b.