A new structure is to be constructed, for which an old structure is to be dismantled.
I would like to know whether the cost incurred in dismantling of old structure should be capitalised or not, and reasons for the same
Nikhil (Article) (24 Points)
09 January 2016A new structure is to be constructed, for which an old structure is to be dismantled.
I would like to know whether the cost incurred in dismantling of old structure should be capitalised or not, and reasons for the same
Ajit Hegde
(CA - Final)
(1367 Points)
Replied 10 January 2016