SIR PLEASE GIVE ADVICE ON CONSTRUCTION OF A BUILDING ON OWN PLOT,AT WHICH YEAR WHOLE AMOUNT OF (PLOT+CONSTRUCTION COST OF BUILDING) SHOWN IN BALANCE SHEET AS AN ASSETS.
ankush sharma (Student CA Final ) (57 Points)
27 November 2015SIR PLEASE GIVE ADVICE ON CONSTRUCTION OF A BUILDING ON OWN PLOT,AT WHICH YEAR WHOLE AMOUNT OF (PLOT+CONSTRUCTION COST OF BUILDING) SHOWN IN BALANCE SHEET AS AN ASSETS.
ROSHAN PAUL JOSEPH
(CA Final student)
(311 Points)
Replied 27 November 2015
Land can be recognised on balance Sheet after the owner acquires the Legal Entitlement.
During the period when building is under construction, it is to be shown under Capital Work in Progress
ROSHAN PAUL JOSEPH
(CA Final student)
(311 Points)
Replied 27 November 2015
It is to be transferred from Capital WIP when the asset is complete and is ready to use.
Viral Patel
(9 Points)
Replied 27 November 2015